Sunday, June 27, 2004

More Progress

A lot has been acomplished in the last two weeks. Kevin built 6 removable access door panels to cover the drive motor and battery areas. Behind each panel, a couple of long bolts stretch from side to side in order to provide the tension necessary to obtain the desired curvature.





All of the high current wiring has been finished, along with trays to hold the batteries.







Geoff built 3 under-seat storage compartments.




0 Comments:

Post a Comment

<< Home